Archery Interchange the UK Archery Forum  

Go Back   Archery Interchange the UK Archery Forum > The Shooting Line > Methodology, Tuning, Coaching etc.

Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 21-03-07, 01:37 PM
It's an X
Join Date: Mar 2006
Location: Poole uk
Posts: 4,463
Coach's work record question.

Does anyone know if there is a set of key features to be included in the coach's work record? ( the record that is sent in when renewal is due)
Thanks
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote


  #2 (permalink)  
Old 21-03-07, 01:48 PM
joetapley's Avatar
In the Gold
  • Recurve
  • Compound
  • Traditional
Setup
Riser:
Limbs: Samick Masters
Sight: Shibuya Double Click
Stabilisers: Beiter Multirod & AG
Button:
Bow String:
Arrows: ACC (ACE when reach

Compound Script currently under construction
Traditional Script currently under construction
Join Date: Apr 2005
Location: Uxbridge
Posts: 839
Geoff

The guideline documentation for everything to do with renewals is downloadable from the GNAS site.

On the other hand if coaching synchronised swimming is worth putting into the work record or not - dunno.
__________________
Joe
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #3 (permalink)  
Old 21-03-07, 02:16 PM
It's an X
Join Date: Mar 2006
Location: Poole uk
Posts: 4,463
Thanks Joe.
Did I look in the wrong place? It says new level1 and senior only where I looked.
And it said "page not found" when I loooked.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #4 (permalink)  
Old 21-03-07, 03:18 PM
napolienne's Avatar
In the Gold
  • Recurve
  • Compound
  • Traditional
Setup
Riser: Riptide Nexus 23"
Limbs: Hex5-H 41# on fingers
Sight: Shibuya
Stabilisers: Beiter
Button: Shibuya DX
Bow String: Majesty
Arrows: ACE 780 25", 100gr points

Compound Script currently under construction
Traditional Script currently under construction
Join Date: Jan 2006
Location: Wigan expat/Oxford
Posts: 1,081
See the CPD matrix here
__________________
be the arrow...

Help save our planet's dwindling resources - put a jumper on and stop being a wuss.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #5 (permalink)  
Old 21-03-07, 04:40 PM
It's an X
Join Date: Mar 2006
Location: Poole uk
Posts: 4,463
Thanks Napolienne. When I first looked at those pages I had the message"page not available" (or similar) I thought that meant GNAS hadn't updated yet, but I think now that it was some other problem as I was able to access them this time.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #6 (permalink)  
Old 21-03-07, 05:00 PM
napolienne's Avatar
In the Gold
  • Recurve
  • Compound
  • Traditional
Setup
Riser: Riptide Nexus 23"
Limbs: Hex5-H 41# on fingers
Sight: Shibuya
Stabilisers: Beiter
Button: Shibuya DX
Bow String: Majesty
Arrows: ACE 780 25", 100gr points

Compound Script currently under construction
Traditional Script currently under construction
Join Date: Jan 2006
Location: Wigan expat/Oxford
Posts: 1,081
Oh the joys of the GNAS website, paragon of quality design...
__________________
be the arrow...

Help save our planet's dwindling resources - put a jumper on and stop being a wuss.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On
Forum Jump


All times are GMT +1. The time now is 09:16 PM.


Powered by vBulletin® Version 3.7.2
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.2.0
Archery-Interchange.com © D. Renton